Sequence step algorithm

From Wikipedia, the free encyclopedia
This is an old revision of this page, as edited by Nonentity683 (talk | contribs) at 10:36, 19 December 2022. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

A sequence step algorithm (SQS-AL) is an algorithm implemented in a discrete event simulation system to maximize resource utilization. [1][2] This is achieved by running through two main nested loops: A sequence step loop and a replication loop. For each sequence step, each replication loop is a simulation run that collects crew idle time for activities in that sequence step. The collected crew idle times are then used to determine resource arrival dates for user-specified confidence levels. The process of collecting the crew idle times and determining crew arrival times for activities on a considered sequence step is repeated from the first to the last sequence step.[3]

See also

Further reading

References

  1. ^ Srisuwanrat, Chachrist (2009). The Sequence Step Algorithm A Simulation-Based Scheduling Algorithm for Repetitive Projects with Probabilistic Activity Durations (Thesis thesis).
  2. ^ Srisuwanrat, Chachrist (2009). The Sequence Step Algorithm A Simulation-Based Scheduling Algorithm for Repetitive Projects with Probabilistic Activity Durations (Thesis thesis).
  3. ^ "Wayback Machine" (PDF). web.archive.org. 2007-10-24. Retrieved 2022-12-19.