The Sequence Step Algorithm (SQS-AL) is an algorithm implemented in discrete event simulation system to maximize resource utilization.
It uses sequence step which is a drawing concept in activity-on-node network to orderly determine repetitive activity start date. This is achieved by first selecting a desire confdetermining the distribution of resoure idle time . The determine repetitive activity start date. the problem of probabilistic repetitive project scheduling.
Further reading
- Photios G. Ioannou and Chachrist Srisuwanrat Sequence Step Algorithm for Continuous Resource Utilization in Probabilistic Repetitive Projects
- Chachrist Srisuwanrat and Photios G. Ioannou The Investigation of Lead-Time Buffering under Uncertainty Using Simulation and Cost Optimization