Sequence step algorithm

From Wikipedia, the free encyclopedia
This is an old revision of this page, as edited by Erik9bot (talk | contribs) at 06:49, 30 May 2009 (add template:uncategorized). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

The Sequence Step Algorithm (SQS-AL) is an algorithm implemented in discrete event simulation system to maximize resource utilization.

It uses sequence step which is a drawing concept in activity-on-node network to orderly determine repetitive activity start date. This is achieved by first selecting a desire confdetermining the distribution of resoure idle time . The determine repetitive activity start date. the problem of probabilistic repetitive project scheduling.