Casing string
This article may meet Wikipedia's criteria for speedy deletion as a very short article lacking sufficient context to identify the subject of the article. See CSD A1.
If this article does not meet the criteria for speedy deletion, or you intend to fix it, please remove this notice, but do not remove this notice from pages that you have created yourself. If you created this page and you disagree with the given reason for deletion, you can click the button below and leave a message explaining why you believe it should not be deleted. You can also visit the talk page to check if you have received a response to your message. Note that this article may be deleted at any time if it unquestionably meets the speedy deletion criteria, or if an explanation posted to the talk page is found to be insufficient.
Note to administrators: this article has content on its talk page which should be checked before deletion. Administrators: check links, talk, history (last), and logs before deletion. Consider checking Google.This page was last edited by Bluebot (contribs | logs) at 13:05, 28 September 2006 (UTC) (18 years ago) |
![]() | This article provides insufficient context for those unfamiliar with the subject. |
This article has not been added to any content categories. Please help out by adding categories to it so that it can be listed with similar articles, in addition to a stub category. |
It is generally not possible to drill a well through all of the formations from surface (or the seabed) to the target depth in one hole section. The well is therefore drilled in sections, with each section of the well being sealed off by lining the inside of the borehole with steel pipe, known as casing and filling the annular space between this casing string and the borehole with cement, before drilling the subsequent hole section. This casing string is made up of joints of pipe, of approximately 40ft in length, with threaded connections. Depending on the conditions encountered, 3 or 4 casing strings may be required to reach the target depth. The cost of the casing can therefore constitute 20-30% of the total cost of the well. Great care must therefore be taken when designing a casing programme which will meet the requirements of the well.