Boeing 787 Dreamliner

From Wikipedia, the free encyclopedia
This is an old revision of this page, as edited by Fnlayson (talk | contribs) at 21:57, 8 July 2007 (World Premiere: removed times, no longer needed). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Template:Future aircraft Template:Infobox Aircraft

The Boeing 787 Dreamliner is a mid-sized, wide-body, twin engine jet airliner currently in production by Boeing's Commercial Airplanes division and scheduled to enter service in May 2008.[1][2] It will carry between 210 and 330 passengers depending on variant and seating configuration. Boeing has stated that it will be more fuel-efficient than earlier Boeing airliners. It will also be the first major airliner to use composite material for most of its construction.[3]

Until January 28, 2005, the 787 was known by the developmental designator 7E7. Early released concept images depicted a radical design with highly curved surfaces. On April 26, 2005, a year to the day after the launch of the program, the final look of the external 787 design was frozen, with a less rakish nose and a more conventional tail. Boeing has completed the final assembly of its first 787 and has scheduled a rollout on July 8, 2007 at 3:30pm PDT and the first test flights in September 2007.[4]

Background

In the late 1990s, Boeing began to consider a replacement for the 767 when sales weakened from the competing Airbus A330-200. As sales of the Boeing 747-400 were also slowing, the company proposed two new aircraft—the Sonic Cruiser and the 747X. The Sonic Cruiser would have achieved higher speeds (approximately Mach 0.98) while burning fuel at the same rate as the existing 767 or A330. The 747X, competing with the Airbus A380, would have stretched the 747-400 and improved efficiency by using a composite supercritical wing.

File:Boeing sonic.jpg
Artist's concept of the Sonic Cruiser, a proposed replacement for the 767

Market interest for the 747X was tepid, but the Sonic Cruiser had brighter prospects. Several major airlines in the United States, including Continental, initially voiced their enthusiam for the Sonic Cruiser concept, although they also expressed concerns about the operating cost.[5] By decreasing travel time, they would be able to increase customer satisfaction and aircraft utilization.

The September 11, 2001 attacks upended the global airline market. Airlines could not justify large capital expenditures, and increased petroleum prices made them more interested in efficiency than speed. The worst affected airlines, in the United States, were considered the most likely customers of the Sonic Cruiser. Boeing offered airlines the option of using the airframe for either higher speed or increased efficiency, but the high projected airframe costs caused demand to slacken further. Boeing canceled the 747X once Airbus launched production of the Airbus A380, and switched tracks by offering an alternative product, the 7E7.[3]

On April 26, 2004, the Japanese airline All Nippon Airways (ANA) became the launch customer for the 787, then still known as the 7E7, by announcing a firm order for 50 aircraft to be delivered beginning in April 2008. ANA's order included thirty 787-3, 290–330 seat, one-class domestic aircraft, and twenty 787-8, long-haul, 210–250 seat, two-class aircraft for regional international routes such as Tokyo NaritaBeijing. The aircraft will allow ANA to open new routes to mid-sized cities not previously served, such as Denver and Montreal. As is common for launch customers in the aviation industry, ANA is rumored to have received a discount of 40–50% off the list price.

The 787-3 and 787-8 variants will be available first, while the 787-9 will enter service in 2010, despite industry rumors that it would be delayed as orders for the 787-3 and 787-8 sold out early production.

Boeing initially priced the 787-8 variant at US$120 million, a low figure that surprised the industry, and it has since been increased twice. As of 2007, the list price was US$138–143 million for the 787-3, US$148–157.5 million for the 787-8 and US$178.5–188 million for the 787-9.[6]

Customer-announced orders and commitments for the 787 reached 237 aircraft during the first year of sales, with firm orders numbering 569 frames at the end of May 2007, well before entry into service (EIS).[7] This makes the 787 the fastest-selling wide-bodied airliner ever upon EIS.[8][9][10]

Development

File:ANA-7E7.jpg
Artist's concept of the 7E7 that shows the nose and tail prior to the final '787' redesign; livery of launch customer All Nippon Airways

The replacement for the Sonic Cruiser project was dubbed the 7E7 (with a development code name of Y2.) The "E" was said to stand for various things, depending upon the audience. To some, it stood for "efficiency", to others it stood for "environmentally friendly". In the end, Boeing claimed it merely stood for "Eight", after the aircraft was eventually rechristened "787".[3]

The 787 essentially uses the technology proposed for the Sonic Cruiser in a more conventional airframe configuration (see Features). Boeing claims that the 787 will be up to 20% more fuel-efficient than current comparable aircraft. A third of this efficiency gain will come from the engines; another third from aerodynamic improvements and the increased use of lighter weight composite materials; and the final third from advanced systems. The most notable system advancement contributing to efficiency is a "more electric architecture" which replaces bleed air and hydraulic power with electrically powered compressors and pumps. Technology from the Sonic Cruiser and 787 will be used as part of Boeing's project to replace its entire airliner product line, an endeavor called the Yellowstone Project (of which the 787 is the first stage).

Boeing selected two engine types, the General Electric GEnx and Rolls-Royce Trent 1000, to power the 787, both placed in pods. Significantly, this leaves Pratt & Whitney, which normally has an entrant in the market, unable to offer one of its engines to 787 customers. According to UTC CEO George David, Pratt & Whitney "couldn't make the business case work for that engine."[11] Also, according to industry sources, Boeing may have wished to rely on evolved versions of existing engines rather than the higher-risk option of an all new engine from Pratt & Whitney. For the first time in commercial aviation, both engine types will have a standard interface with the aircraft, allowing any 787 to be fitted with either a GE or Rolls-Royce engine at any time. Engine interchangeability makes the 787 a more flexible asset to airlines, allowing them to change easily from one manufacturer's engine to the other's if required.[3] The engine market for the 787 is estimated at US$40 billion over the next 25 years. The launch engine for all three current 787 variants is the Rolls-Royce Trent 1000.

The launch of a new airliner can be expected to draw scathing comments from competitors, Boeing's doubt over the Airbus A380 and Airbus's mocking of the Sonic Cruiser being recent examples. The 787 is no exception, as Airbus's John Leahy attempted to refute all of Boeing's claims. Leahy openly criticized the large-scale use of composites in the 787's fuselage as being "rushed and ridiculous", although Boeing built and tested the first composite section while examining the Sonic Cruiser concept nearly five years ago,[12] making the 787 a significantly refined product.[13] Airbus has offered the competing A350 using derivatives of the turbofans developed for the 787. This new jet will make less widespread use of composites with Airbus preferring aluminum-lithium alloys for the fuselage.[14]

Boeing has stated it is likely to develop a stretched version, "787-10", with seating capacity between 290 and 310.[15][16] This proposed model is intended to compete with the planned Airbus A350-900.[17] The 787-10 would supersede the 777-200ER in Boeing’s current lineup, and could also compete against the Airbus A330-300 and A340-300. Emirates Airlines and Qantas have shown interest in such variant that would enter service in 2013, a year later than initially publicly discussed.[18][19] This variant has not yet been officially launched by Boeing, but Mike Bair, head of the 787 Program, has stated that "It's not a matter of if, but when we are going to do it... The 787-10 will be a stretched version of the 787-9 and sacrifice some range to add extra seat and cargo capacity."[20]

World Premiere

On March 19 2007, Boeing Commercial Airplanes' President and CEO Scott Carson and 787 program manager Mike Bair told reporters and investors that Boeing intends to roll out the first 787 on July 8 2007, which matches the aircraft's designation in the US-style month-day-year format.[21] Boeing will host at Qwest Field on Sunday, July 8, 2007 at 3:30 pm PDT a live simulcast on the stadium screens for up to 50,000 employees and retirees as the first 787 Dreamliner rolls out in Everett.[22] Boeing will fly in around 800 representatives of airline customers, including the CEOs of all 45 airlines that have ordered the Dreamliner to attend the rollout.[23] The general public can view the rollout via satellite in nine different languages (a listing can be found at http://www.boeing.com/commercial/787family/787premiere.html) or over the Internet at http://787premiere.newairplane.com/. [24][25]

Description

File:BCA 787 Flight deck.jpg
Boeing's prototype 787 flight deck

Features

  • 18.5 in (47 cm) seat-bottom width in economy class in 2+4+2 or 3+2+3 arrangements. Seat widths would be approximately 17.2 in (43.7 cm) for 3+3+3 seating. 17.2 in seats are also found on the Boeing 737. The vast majority of airlines are expected to select the 3+3+3 configuration on the 787.[citation needed]
  • Cabin interior width 50 in (127 cm) from the floor is 18 ft 7 in (566 cm) and was recently increased by 1 inch (2.5cm). The 787's interior cabin width, measured at seated eye level (where width is actually perceived by passengers, according to studies conducted at Boeing) is a full 15 in (38 cm) greater than that of the Airbus A330 and A340, but 5 in (13 cm) smaller than the currently expected future competitor, the A350-800 XWB.
  • Two class configuration of 240 seats in two class domestic, with 46 in (116.8 cm) first class pitch and 34 in (86.4 cm) coach class. 296 passengers can be seated in a high density 3+2+3 coach arrangement with 36 in (91.4 cm) Business and 32 in (81.3 cm) Coach pitch. Up to 234 passengers may be seated in a three-class setup that uses 61 in (154.9 cm) pitch in First Class (2+2+2 or 2+1+2), 39 in (99 cm) pitch for Business (2+3+2 or 2+2+2) and 32 in (81.3 cm) for Coach (2+4+2).
  • Cruise speed: 0.85 Mach[26] (903 km/hr / 561 mph at typical cruise altitudes)
  • The longest range variant can fly 8,000 to 8,500 nautical miles (14,800 to 15,700 km), enough to cover the Los Angeles to Bangkok or New York City to Taipei routes.
  • Construction materials (by weight): 50% composite, 20% aluminum, 15% titanium, 10% steel, 5% other. Composite materials are significantly lighter and stronger than traditional aircraft materials, making the 787 a very light aircraft for its capabilities. By volume, the 787 will be 80% composite. This will allow the potential to take off from, and land on, relatively short airstrips as the 767 can, yet still have the capability to fly long-haul distances.[27]
  • The 787 production line will be able to finish an aircraft in as little as three days, compared with 11 days for the 737.
  • Larger windows than any other current in service civil air transport (27 cm by 47 cm), with a higher eye level, so passengers can see the horizon, with liquid crystal display (LCD)-based "auto-dimming" to reduce cabin glare and maintain transparency. These are to be supplied by PPG.[28]
  • Light-emitting diode (LED)[29] cabin lighting (three color), will be used instead of fluorescent tubes, allowing the aircraft to be entirely 'bulbless' and have 128 color combinations.
  • A version of EthernetAvionics Full-Duplex Switched Ethernet (AFDX) / ARINC 664 -- will be used to transmit data between the flight deck and aircraft systems.
  • LCD multi-function displays on the flight deck, all of which will use an industry standard GUI widget toolkit (Cockpit Display System Interfaces to User Systems / ARINC 661).[30] The Lockheed Martin Orion spacecraft will use a glass cockpit derived from Rockwell Collins's 787 flight deck.[31]
  • Bleedless turbofans, allowing elimination of superheated air conduits normally used for de-icing, aircraft power, and other functions. These systems are to be replaced by an all-electrical system.[3]
  • Cabin air provided by electrically driven compressors (no engine bleed air).
  • Higher humidity in the passenger cabin because of the use of composites (which do not corrode).
  • The internal pressure will be increased, to the equivalent of 6000 feet (1800 m) altitude instead of the 8000 feet (2400 m) on conventional aircraft. According to Boeing, this will significantly improve passenger comfort.[32]
  • Boeing is experimenting with several engine noise reducing technologies for the 787. Among these are a redesigned air inlet containing sound-absorbing materials and redesigned exhaust duct covers whose rims are tipped in a toothed pattern to allow for quieter mixing of exhaust and outside air. Boeing expects these developments to make the 787 significantly quieter both inside and out.
  • Improved ride quality through Active Gust Alleviation system, similar to the system that Boeing built for the B-2 bomber.

Early concept images of the 787 included rakish cockpit windows, a dropped nose and a distinctive "shark-fin" vertical stabilizer. The final styling of the aircraft was more conservative, the fin appearing visually similar to those of aircraft currently in service. The nose and cockpit windows were also changed to a more conventional form. Like other Boeing airliners, the 787 will use a yoke instead of the sidestick found on Airbus designs.

Production

File:B787 Section 41.jpg
Prototype nose section of the 787-8, unveiled at Spirit Wichita for the first time; this unit was an engineering test article and had considerable differences from the final design.
File:Boeing 787 actual fuselage section.jpg
First production fuselage section being transported to Nagoya Airport
File:Boeing 747-400LCF 2.jpg
Fuselage barrel sections will be flown to Everett on 747 Large Cargo Freighter.
File:Boeing 787 Assembly.jpg
The first 787 beginning final assembly (June 5, 2007)

Boeing will manufacture the 787's tail fin at its plant in Frederickson, Washington, the ailerons and flaps at Boeing Australia, and fairings at Boeing Canada Technology. For its entire history, Boeing has guarded its techniques for designing and mass producing commercial jetliner wings. For economic and political reasons, the wings will be manufactured by Japanese companies in Nagoya, e.g. Mitsubishi Heavy Industries; the horizontal stabilizers will be manufactured by Alenia Aeronautica in Italy; and the fuselage sections by Vought in South Carolina (USA), Alenia in Italy, Kawasaki Heavy Industries in Japan and Spirit AeroSystems, in Wichita, Kansas (USA).[33]

The passenger doors will be made by Latecoere (France) and the cargo doors, access doors and crew escape door will be made by Saab (Sweden). Japanese industrial participation is very important to the project, with 35% work share, with many of the subcontractors supported and funded by the Japanese government.[34] On April 26 2006, Japanese manufacturer Toray Industries and Boeing announced a production agreement involving $6 billion worth of carbon fiber. The deal is an extension of a contract signed in 2004 between the two companies and eases some concerns that Boeing might have difficulty maintaining its production goals for the 787.[3]

From France, Messier-Dowty will build the landing gear and Thales will supply the integrated standby flight display and electrical power conversion system.[3]

Honeywell and Rockwell-Collins will provide flight control, guidance and other avionics systems, including standard dual head up guidance systems. Future integration of forward-looking infrared is being looked at by Flight Dynamics allowing improved visibility using thermal sensing as part of the HUD system, allowing pilots to "see" through the clouds.[3]

Hamilton Sundstrand will provide power distribution and management systems for the aircraft, including manufacture and production of Generator Control Units (GCUs) as well as integration of power transfer systems that can move power from the Auxiliary Power Unit (APU) and the main engines to the necessary parts and machinery of the aircraft. They have performed the cold weather tests in Alaska.

The final assembly will consist of attaching fully-completed subassemblies,[35] instead of building the complete aircraft from the ground up. This is a technique which Boeing has previously used on the 737 program, which involves shipping fuselage barrel sections by rail from Spirit's Wichita, Kansas facility to Boeing's narrowbody final assembly plant at Renton, Washington. After stiff competition, Boeing announced on December 16, 2003 that assembly would take place in Everett, Washington, employing 800 to 1,200 people.[3]

The 787 will undergo wind-tunnel testing at Boeing's Transonic Wind Tunnel, QinetiQ's five-meter wind tunnel at Farnborough, UK, and NASA Ames Research Center's wind tunnel, as well as at the French aerodynamics research agency, ONERA.

The first composite section rolled out in January 2005 and final external design was set in April 2005. On June 30, 2006 Boeing celebrated the start of major assembly of the first 787 at Fuji Heavy Industries' new factory in Handa, Japan, near Nagoya.[36]

Boeing intends to deliver 118 aircraft during the first 18 months of production. Because of customer demand, Boeing is currently considering whether to increase production, if the production capacity of suppliers allows.[37]

On December 3, 2006, Boeing conducted a "virtual rollout" of the 787. Unlike a traditional rollout (which will occur later), it took place without a physical airframe present. Taking computer aided design beyond the aircraft itself, Boeing modeled the manufacturing process, step-by-step and end-to-end, in software. The virtual rollout is intended to discover production issues prior to assembly of the first airframe, when they are cheaper to fix.[38]

On January 12, 2007, first major assemblies, forward fuselage, center wing and center wheel well built by FHI and KHI were shipped on 747-400 LCF from Nagoya, Japan. They were delivered to Global Aeronautica in Charleston, South Carolina on January 15.[39]

On February 15, 2007, the first production nose section (Section 41) was unveiled at Spirit AeroSystems in Wichita, Kansas. This was the first production nose section, used in the first complete flight-test 787 and represents those used in all subsequent production 787s. It encompasses the cockpit area, nose landing gear well and the forward-most section of the passenger area. The section is oval-shaped (as is the entire fuselage) and is 21 feet (6.4 m) in height, 19 feet (5.74 m) in width and 42 feet (12.8 m) in length.

On March 14, 2007, the first production vertical tail fin was rolled out at Boeing's Composite Manufacturing Center in Frederickson, Washington.[40] On April 16, the first production all-composite nose-and-cockpit section was rolled out at Spirit Aerosystem's plant in Wichita, Kansas.[41] The 747-400 LCF Dreamlifter delivered the first horizontal stabilizer manufactured by Alenia Aeronautica at its facility in Foggia, Italy to Everett on April 24. [42] On May 8, 2007, Vought rolled out completed rear Sections 47 and 48 from its factory in Charleston, SC.[43] The sections were flown via the Dreamlifter to Everett, arriving on May 11 along with the all-composite forward section (section 41) manufactured by Spirit AeroSystems. [44]

Mitsubishi Heavy Industries Ltd. sent the first 787 carbon-fiber wings from its factory in Nagoya to Boeing's main assembly plant in Everett on May 15, 2007.[45][46] The Dreamlifter delivered the final major assembly, the integrated midbody fuselage, to Everett at 1:58 a.m. on May 16.[47] Final assembly began on May 21 in Everett, Washington.[48] Rolls-Royce shipped the first pair of Trent 1000 engines from their Derby, UK facilities on schedule on June 7 for installation on the Boeing 787.[49] As of June 26, LN1/ZA001 has finished major assembly, and was towed to the paint hangars in the early morning.[50]

Technical concerns

Engine interchangeability

The two types of engines compatible with the 787 will use a standard electrical interface, potentially allowing any aircraft to be fitted with Rolls-Royce or GE engines at any time. This flexibility will allow an airline to switch from one manufacturer to the other in the event of technological developments which conform more closely to their operating profile. Boeing's goal is to make changing engine types as simple as a standard same-manufacturer replacement.

According to ILFC's Vice President of Marketing, Marty Olson, changing engine types on a 787 could take as long as 15 days and so be economically infeasible. "You'd have to take all the pylon, everything from the wing down, off" Olson said. He went on to complain that Boeing is still promoting the 24 hours change in spite of promises to alter their marketing. Current aircraft can have engines changed to those of a different manufacturer but this rarely happens due to the costs involved. Boeing's response is that the design is not yet finalized and 24 hours remains their goal.[51]

Composite fuselage

The 787's all-composite fuselage makes it the first composite airliner in production. It was suggested by many that the risks of having a composite fuselage have not been fully assessed and should not be attempted. It was also added that carbon fiber, unlike metal, does not visibly show cracks and fatigue and repairing any damage done to the aircraft would not be easy.[52] Boeing has dismissed such notions insisting that composites have been used on wings and other passenger aircraft parts for years and this is a non-issue. They have also stated that special defect-detection procedures will be put in place to negate any concern.[53] In 2006, Boeing launched the 787 GoldCare program.[54] This is a comprehensive life-cycle management service whereby all the aircraft that sign up for this program are routinely monitored and repaired if needed. This is the first program of its kind from Boeing: post-sale protection programs are not new, but have usually been offered by third party service centers. Boeing believes this brings them additional revenue and will also allow them to nullify any concern over maintaining this aircraft for over-anxious airlines.

Weight issues

Boeing has been working on trimming excess weight since assembly of the first unit began earlier in 2006. This is typical in aviation for new aircraft during their development phase. The aircraft is first designed on computers and an empty weight is promised to customers to ensure fuel efficiency and payload obligations. However, upon assembly, some parts may be manufactured with minor variances that multiply dramatically if the part is used frequently.

The first six 787s built, which are to be used as part of the test program, will be overweight according to Boeing Commercial Airplanes CEO Scott Carson. However, the seventh, which will be the first to be delivered to an airline customer, is expected to be on target.[55] Boeing has redesigned some parts, and made more use of titanium.[38] The weight target that is pledged to customers is for a "green aircraft" with no interior fittings. Each airline chooses its own seats, and amenities that add weight in varying degrees, but are not related to Boeing's obligations.

Variants

File:787 range.jpg
Range of 787-3 and 787-8 - on regional flights, the 787-3 can cover all of North America, South America, Europe, most of Africa, and 70% of Asia end to end.

There are three variants of the 787 and all launched at the same time in 2004. The 787-8 will enter service in 2008. The 787-3 will enter service next in 2010. The last to enter service will be the 787-9 in 2010.

787-3

This will be a 223 seat (three class) or 296 seat (two class) short-range version targeted at high-density flights, with a range of 2,500 to 3,050 nautical miles (4,650 to 5,650 km) when fully loaded. It is designed to replace the Airbus A300, Boeing 757-300, Boeing 767-200 and -300. The 787-3's intended entry into service is 2010. This model is limited in its range, not by fuel capacity but by a low maximum take-off weight of 360,000 lb (163,290 kg). It currently has the same fuel capacity as the 787-8. Range is given for any fuel capacity left after the aircraft weight and payload is subtracted from the Maximum Take-Off Weight (MTOW). With a full load of passengers and cargo, it will be limited by the amount of fuel it can take on board. This is an advantage on shorter, high-density routes especially those separated by water such as Tokyo to Shanghai, Osaka to Seoul or London to Berlin. Many airports charge landing fees depending on the weight of the aircraft, thus an airliner rated at a lower MTOW would pay lower fees.

File:Boeing 787-3.jpg
Boeing 787-3 with winglets and a shorter span

The 787-3's wing will be different from the other versions. It will use winglets instead of raked wingtips used on other variants. This decreases the wingspan and the aircraft weight. The wing will be the same except for the last 13 feet[56] outboard of the ailerons. Due to the decrease in weight, winglets provide better efficiency over short distances than raked wingtips. The 787-3 having a MTOW considerably lower than the -8 variant does not need the lift the extra span provides. Having wings that provide more lift than needed decreases efficiency. The twenty-six feet wingspan reduction also enables the -3 to use gates reserved for medium sized planes.

Thirty years ago it was common to fly from New York to Los Angeles in a 747.[1] Typically, four or five flights occurred per day, one per major airline. With deregulation, more and more airlines joined the route. Overcapacity led to airlines using smaller planes. Now there are around 47 direct flights per day mostly on 737 or Airbus A320 or reconfigured 757s and 767-200s between the two cities, with each flight usually carrying around 100-160 passengers (70% load factor). This has led to higher congestion and more pollution.[2] This same phenomenon is occurring in Asia, Europe, and South America. With the proliferation of open sky agreements, numerous airlines have been started in countries like Brazil, India, China, and throughout Europe. These start-ups have placed more pressure on capacity on trunk routes and have encouraged the usage of ever smaller planes between very large cities.[3]. Routes like São Paulo to Buenos Aires, Berlin to Paris, Mumbai to Calcutta are now increasingly being served by single aisle planes when larger ones would be more logical. Boeing believes that the pendulum has swung too far and the future of aviation between very large (but close) cities of five million or more would stabilize around the capacity level of the 787-3.[4][5] It also believes legacy carriers that want to battle with low cost airlines can use this plane with twice the capacity of a single aisle craft but less than twice its operating cost (fuel, landing fees, maintenance, number of flight crew, airspace fees, parking fees, gate fees, etc.). Boeing sees the 787 family as a game changer with this variant as the most unique of the three.

Regions such as India and East Asia, where large population centers are in close proximity, can make good use of the 787-3. Approximately 3.1 billion people live within the range of the 787-3 if used in India or China. The 787-3's efficiency may offset the higher landing fees and acquisition costs (compared to a single-aisle plane) and make it useful on such routes. A 3,050 nm (5,600 km) range, or flight time of roughly six hours, is sufficient to connect many major cities and improve comfort and efficiency. The 787-3 is not a replacement for single aisle planes, but can relegate them to cities with fewer than 2 million people.

To date, however, only Japanese airlines have ordered this model for routes within East Asia.

787-8

This variant is similar to the 787-3 with the exceptions of longer wings with raked wingtips for long-range efficiency[56] and a substantially longer range of 7,650 to 8,200 nautical miles (14,200 to 15,200 km). The 787-8 seats 223 passengers in three classes. The variant will be the first of the 787 line to enter service in 2008. Boeing is targeting the 787-8 to replace the 767-200ER and 767-300ER.

787-9

File:CO789.jpg
A 787-9 in Continental Airlines livery

This will be a "stretched" variant, seating 263 in three classes with a range of 8,000 to 8,500 nautical miles (14,800 to 15,750 km). The targeted entry into service (EIS) is set for 2010.[57] Boeing is targeting the 787-9 to compete with Airbus' Airbus A330-200 and Airbus A340-200 and to replace their own 767-400ER. This variant is identical to the 787-8 except for structural strengthening, the lengthened fuselage and a higher fuel capacity. The 787-9 also has a slightly wider wingspan compared to the 787-8. Each wingtip has been further extended by three feet. When first launched, it had the same fuel capacity as the other two variants. These differences meant higher weight and resulted in a slightly shorter range than the 787-8. After further consultation with airlines, design changes were incorporated to add a forward tank to increase its fuel capacity. It will have a longer range and a higher maximum take-off weight (MTOW) than the other two variants. The -9 will be able to fly non-stop from New York to Manila or from Moscow to São Paulo and will have the lowest seat-mile cost of the three 787 variants.

Early sales of this variant were limited by its 2010 entry into service. The 787-8's smaller size and earlier entry date were attractive to most airlines and led to the 787-8 receiving the most orders. With the first four years of production completely sold out, airlines have begun weighing the option of the 787-8 against the 787-9 since either one can be delivered after 2010. Analysts speculate that the 787-9's higher capacity and longer range will eventually make it the most popular variant especially among blue chip airlines. Air New Zealand is the launch customer for the 787-9 and the second customer ever for the Boeing 787 behind ANA. Qantas, Singapore Airlines and Continental Airlines have placed the largest orders for the 787-9.

Orders and deliveries

The Boeing 787 has not yet entered service. To see a list of all current orders please see List of Boeing 787 orders.

Specifications

Orthographically projected diagram of the Boeing 787-8
Orthographically projected diagram of the Boeing 787-8
Model 787-3 787-8 787-9
Cockpit Crew Two
Passengers 290 to 330 210 to 250 250 to 290
Length 186 ft 1 in (56.72 m) 206 ft (63 m)
Wingspan 170 ft (52 m) 197 ft (60 m) 203 ft (62 m)
Wing Sweepback 32.2°
Height 55 ft 6 in (16.92 m)
Cabin Width 18 ft 9 in (5.72 m)
Cargo Capacity 4,400 ft³ (124.6 m³) 28 LD3 5,400 ft³ (152.9 m³) 36 LD3
Empty Weight 223,000 lb
(101,200 kg)
242,000 lb
(110,000 kg)
254,000 lb
(115,200 kg)
Maximum Takeoff Weight 364,000 lb
(165,100 kg)
484,000 lb
(219,540 kg)
540,000 lb
(244,940 kg)
Cruise Speed .85 Mach (561 mph, 487 knots, 902 km/hr at 40,000 feet)[58][59][60]
Maximum Cruise Speed .89 Mach (587 mph, 510 knots, 945 km/hr at 40,000 feet)
Range, Loaded 2,500 - 3050 nm
(4,650 - 5,650 km)
7,650 - 8,200 nm
(14,200 - 15,200 km)
8,000 - 8,500 nm
(14,800 - 15,750 km)
Max. Fuel 33,528 US gal (126,903 L) 36,693 US gal (138,700 L)
Service Ceiling 43,000 ft (13,100 m)
Engines (2×) General Electric GEnx or Rolls-Royce Trent 1000
Max. Thrust 53,000 lbf (236 kN) 64,000 lbf (285 kN) 70,000 lbf (311 kN)

References

  1. ^ "ANA rules out swapping delivery slots for 787." Reuters. November 12, 2006.
  2. ^ "787's big sections may be in Everett by February." Wallace, J. Seattle Post-Intelligencer. November 7, 2006.
  3. ^ a b c d e f g h i Norris, G.; Thomas, G.; Wagner, M. and Forbes Smith, C. (2005). Boeing 787 Dreamliner - Flying Redefined. Aerospace Technical Publications International. ISBN 0-9752341-2-9.{{cite book}}: CS1 maint: multiple names: authors list (link)
  4. ^ ""Boeing may delay 787 maiden flight"". www.channelnewsasia.com. Retrieved 2007-06-18.
  5. ^ Banks, Howard (May 28, 2001). "Paper plane: That Mach 0.95 Sonic Cruiser from Boeing will never fly. Here's why". Forbes. Retrieved 2007-06-07. {{cite news}}: Check date values in: |date= (help)
  6. ^ "Commercial airplane - jet prices." Boeing.
  7. ^ "Boeing's 787 Dreamliner Surpasses 500 Customer Orders in under Three Years." Boeing press release. April 3, 2007.
  8. ^ "Boeing/McDonnell Douglas Orders and Deliveries." Boeing.
  9. ^ 47th International Paris Air Show 2007: 787 Progress Report. Mike Bair, Vice President and General Manager, 787, Boeing Commercial Airplanes. June 19, 2007.
  10. ^ " Corporate Information - Orders and Deliveries." EADS Airbus.
  11. ^ "Rolls-Royce At Your Service." BusinessWeek. November 14, 2006.
  12. ^ "Boeing Testing Sample Sonic Cruiser Fuselage." Boeing.
  13. ^ "Development Work on Boeing 787 Noses Ahead." Boeing. July 13, 2005.
  14. ^ "The A350 XWB: a family concept with all of the extras." EADS Airbus.
  15. ^ "Everett work force for 787 pegged at 1,000." Wallace, J. Seattle Post-Intelligencer. December 22, 2005.
  16. ^ Thomas, G. (2005-09-26). "Boeing looks at larger Dreamliner to meet Emirates, BA requirements". Air Transport World. ATW Media Group. {{cite news}}: Check date values in: |date= (help)
  17. ^ Thomas, G. (2005-12-23). "Boeing bullish on 787-10, Dreamliner production". Air Transport World. ATW Media Group. {{cite news}}: Check date values in: |date= (help)
  18. ^ Leach, Yvonne and Gunter, Lori. "Boeing Highlights Progress on First 787, Subsequent Airplanes". Boeing Press Release. Retrieved 2007-06-23.{{cite web}}: CS1 maint: multiple names: authors list (link)
  19. ^ Baseler, Randy. "Dash 10". Boeing Blog. Retrieved 2006-02-08.
  20. ^ "Boeing to Build Stretch 787 Jet," The Wall Street Journal, March 27, 2006.
  21. ^ "Boeing Says 787 is on Target for July 8 Rollout, August First Flight". Aero-News.Net. March 20, 2007. Retrieved 2007-03-24. {{cite news}}: Check date values in: |date= (help)
  22. ^ Gates, Dominic (June 6, 2007). "Boeing will stage 787 rollout extravaganza at Qwest Field". The Seattle Times. Retrieved 2007-06-06. {{cite news}}: Check date values in: |date= (help)
  23. ^ Gates, Dominic (June 21, 2007). "Boeing, Airbus sales chiefs seal the deal in different ways". The Seattle Times. Retrieved 2007-06-21. {{cite news}}: Check date values in: |date= (help)
  24. ^ Wallace, James (June 7, 2007). "787 rollout includes event at Qwest Field". Seattle Post Intelligencer . Retrieved 2007-06-10. {{cite news}}: Check date values in: |date= (help)
  25. ^ "Watch the 787 rollout event live on 7/8/07". Boeing web page. Retrieved 2007-06-22.
  26. ^ Boeing 787 program background, Accessed 2007-05-04.
  27. ^ "$76 million extreme makeover for Wellington Airport." Wellington International Airport press release. August 4, 2005.
  28. ^ "Qantas deal sees launch of 787-9." Norris, G. Flight International. December 20, 2005.
  29. ^ "Cabin Interior, Mood Lightning". Diehl Aerospace, Germany. Retrieved 2007-05-01.
  30. ^ "What is ARINC 661?" Web archive of Engenuity Technologes page.
  31. ^ Coppinger, Rob (October 6, 2006). "NASA Orion crew vehicle will use voice controls in Boeing 787-style Honeywell smart cockpit". Flight International. Retrieved 2006-10-06. {{cite news}}: Check date values in: |date= (help)
  32. ^ "Boeing Unveils 787 Dreamliner Flight Deck." Boeing press release. August 31, 2005.
  33. ^ "Boeing 787: Parts from around world will be swiftly integrated". Gates, D. The Seattle Times, September 11, 2005.
  34. ^ Boeing’s Diffusion of Commercial Aircraft Design and Manufacturing Technology to Japan
  35. ^ "Boeing Unveils 787 Final Assembly Factory Flow." Boeing. December 6, 2006.
  36. ^ "Major Assembly of First Boeing 787 Dreamliner Starts." Boeing press release. June 30, 2006.
  37. ^ "Boeing may need 10 Dreamliner fuselages a month." Gunsalus, J. Bloomberg News Seattle Post-Intelligencer. March 6, 2007
  38. ^ a b "Virtual rollout of the 787." Wallace, J. Seattle Post-Intelligencer. December 7, 2006.
  39. ^ "Boeing Closer to Assembling First 787 Dreamliner." Boeing press release. January 12, 2007.
  40. ^ "Boeing Rolls Out First 787 Vertical Fin" Boeing press release. March 14, 2007.
  41. ^ "Dreamliner sticks its nose out in public" Seattle Times article. April 16, 2007.
  42. ^ "First Major Assembly for Boeing 787 Dreamliner Delivered to Everett" Boeing press release. April 25, 2007.
  43. ^ "Vought Completes, Delivers First Boeing 787 Aft Fuselage" Vought press release. May 11, 2007.
  44. ^ "Fuselage Sections for Boeing 787 Dreamliner Delivered to Everett" Boeing press release. May 11, 2007.
  45. ^ "Boeing's First Wing for 787 Arrives From Japan in May" Suga, Masumi and Johnson, Nicolas. Bloomberg. April 24, 2007.
  46. ^ "Wings for Boeing 787 Dreamliner Delivered to Everett" Boeing press release. May 15, 2007.
  47. ^ "Final Major Structure for Boeing 787 Dreamliner Delivered to Everett" Boeing press release. May 16, 2007.
  48. ^ "Final Assembly Begins on First Boeing 787 Dreamliner" Boeing press release. May 21, 2007.
  49. ^ "787 Rolls-Royce Ships First Trent 1000s For 787 Rollout: Dreamliner Turbofans Slated For Cert Later This Year". Aero-News.net. June 7, 2007. Retrieved 2007-06-08. {{cite news}}: Check date values in: |date= (help)
  50. ^ "First 787 Dreamliner emerges from assembly line". Seattle Post-Intelligencer. June 26, 2007. Retrieved 2007-06-27. {{cite news}}: Check date values in: |date= (help); Italic or bold markup not allowed in: |publisher= (help)
  51. ^ "787 Isn't Meeting 24hour-Engine Change Promo, lessor says." Leeham Co. LLC. July 18, 2005.
  52. ^ "The 787 Encounters Turbulence." BusinessWeek. June 19, 2006.
  53. ^ "Airbus to use composites." Wallace, J. Seattle Post-Intelligencer. January 10, 2006.
  54. ^ Bickers, Chaz (July, 2006). "Good as GoldCare: Revolutionary 787 fleet support program complements airplane's technical achievements" (PDF). Boeing Frontiers. {{cite news}}: Check date values in: |date= (help)
  55. ^ Boeing Still Working On 787 Weight Issue, Carson Says." Associated Press. December 7, 2006
  56. ^ a b "The Boeing 787 Dreamliner: More Than Just an Airplane." Nielson, D. Boeing. May 17, 2005.
  57. ^ "Aerospace Notebook: New 787 is taking off." Wallace, J. Seattle Post-Intelligencer. April 27, 2005.
  58. ^ Boeing 787-3 Dreamliner Fact Sheet
  59. ^ Boeing 787-8 Dreamliner Fact Sheet
  60. ^ Boeing 787-9 Dreamliner Fact Sheet

Template:Boeing Airliners Related development

Aircraft of comparable role, configuration, and era

Related lists