Jump to content

USS S-20

From Wikipedia, the free encyclopedia
This is an old revision of this page, as edited by Cla68 (talk | contribs) at 02:56, 17 October 2007 (stub tag). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.
insert caption here
Career USN Jack
Ordered:
Laid down: 15 August 1918
Launched: 9 June 1920
Commissioned: 22 November 1922
Decommissioned: 16 July 1945
Fate: sold for scrap
Stricken: 25 July 1945
General Characteristics
Displacement: 854 tons surfaced, 1062 tons submerged
Length: 219 ft 3 in (67 m)
Beam: 20 ft 8 in (6.3 m)
Draft: 15 ft 11 in (4.9 m)
Propulsion:
Speed: 14.5 knots (27 km/h) surfaced, 11 knots (20 km/h) submerged
Range:
Complement: 38 officers and men
Armament: 1 x 4 in (102 mm) gun, 4 x 21 in (533 mm) torpedo tubes
Motto:

USS S-20 (SS-125) was a first-group (S-1 or "Holland") S-class submarine of the United States Navy. Her keel was laid down on 15 August 1918 by the Bethlehem Shipbuilding Corporation in Quincy, Massachusetts. She was launched on 9 June 1920 sponsored by Miss Anne Claggett Zell, and commissioned on 22 November 1922 with Lieutenant John A. Brownell in command.

In addition to duty in northeastern points out of New London, Connecticut, from 1922 into 1929, the new submarine visited Coco Solo in the Panama Canal Zone, in March 1923; served at Saint Thomas, United States Virgin Islands, in February 1924; and operated in the Panama Canal area from January through April 1926. S-20 visited Kingston, Jamaica, from 20 March to 28 March 1927, and served again in the Panama Canal area from 17 April 1929 into November 1930. Departing Coco Solo on 7 November, S-20 arrived at Pearl Harbor on 7 December that year. Following duty there, she sailed on 20 February 1932 and, from March of that year into April 1933, served at Mare Island. Later, she operated mainly at San Diego, California, into 1934. Departing San Diego on 15 March, S-20 returned to New London on 28 October. From then into December 1941, she operated there as part of a test and evaluation division. During this period, she visited Guantanamo in February and March 1938; served in the Panama Canal area from January into March 1939; and visited Guantanamo again in February 1940.

From December 1941 into July 1945, S-20 continued to operate from New London. Her operations were off New England and often included training activities at Casco Bay, Maine. Departing New London on 2 July 1945, S-20 was decommissioned on 16 July at Philadelphia, Pennsylvania. Her name was struck from the Naval Vessel Register on 25 July. She was sold on 22 January 1946 to North American Smelting Company, Philadelphia, for scrapping.

References

Public Domain This article incorporates text from the public domain Dictionary of American Naval Fighting Ships.